Project story · Greenhouse · Quebec

Zyromski Greenhouse

An 18 million BTU wood chip system for a flower and plant grower in Quebec. Built in our shop, lifted in by crane in 2024.

Get a quoteCall (204) 694-2398

Location

Quebec

Grows

Flowers and plants

System

SCW CGS 2600
18 million BTU/h (5,275 kW)

Fuel

Wood chips

Installed

2024

Heating cost

About 50% lower

The job

Zyromski grows flowers and plants in Quebec. Their greenhouses need a lot of heat, so we built one of our larger systems: 18 million BTU.

The system left our shop in Headingley on a flatbed in October 2024.

SCW chain grate stoker loaded on a flatbed

Loaded at our shop in Headingley, October 2024.

Crane lifting the boiler vessel at Zyromski Greenhouse

Install day: the boiler vessel goes in first.

Install day

On site, a crane lifted the boiler vessel in, still wrapped from the trip. Then it swung the chain grate stoker over the building and set it in place.

  • Boiler and chain grate stoker, 18 million BTU.
  • Incline auger feeding wood chips to the stoker.
  • Controls built in our shop, with remote monitoring.

The fire

Wood chips burning evenly across the chain grate. The grate keeps moving, so ash comes off the end on its own.

Wood chip fire on the chain grate

Looking into the firebox while it runs.

“The crane day went smooth, and it has run two winters without fuss. Our heating cost is about half what it was.”

Zyromski Greenhouse, Quebec

The result

It has run through two Quebec winters on wood chips. Heating cost is about 50% lower than before.