Vanderveens Greenhouse in Manitoba on a cold, clear winter day: the boiler building, its stacks and the long greenhouse range beside it
Greenhouses, nurseries and garden centres

Greenhouse heat from wood chips

After labour, heat is the biggest bill in most greenhouses. Our boilers burn wood chips and sawmill waste. Growers in Manitoba and Quebec running our systems pay about half what they paid for gas or propane.

Vanderveens Greenhouse, Manitoba. Four SCW boilers in one building heat this range.
200+biomass systems running in North America
About halfthe heating cost our greenhouse customers paid before
0.5 to 27M BTUper boiler, or several in one building
25+ yearsbuilding in Headingley, Manitoba
Boiler and tank planner

Plan for the coldest clear night

A greenhouse needs little heat when the sun is on it and the most just before sunrise. Your storage tank stores daytime heat for the night, so the boiler doesn't have to be sized for the worst hour. Set up your greenhouse and watch one design day go by.

What you grow
Growing area
Covering
Your storage tank
100 m³

Your builder sizes the tank. We don't supply it. Slide to zero to see a system with no tank.

Boiler needed with no tank0M BTU/h
Boiler needed with your tank0M BTU/h
Tank that lets the boiler run at the day's average0 m³

SCW boilerYour storage tankGreenhouse
12:00 p.m.−25°C outside
Greenhouse needs –
Boiler puts out –
Tank –
Heat the greenhouse needsSCW boiler with your tankExtra heat into the tankTank covers the gapBoiler with no tank

Rule of thumb, not a design. It starts from the Canadian rule of about 3.3 million BTU an hour per acre of double poly on a −30°C night, then adjusts for your covering, setpoints and coldest night. It assumes a clear, calm day, and a tank that gives up about 25°C before it is used up (for example 85°C at the top down to 60°C). Wind, leaky walls, curtains left open or a cooler tank change the real numbers. Your engineer or greenhouse builder works those out, and we size the boiler with them.

Who builds what

From the fuel pile to the pipe rail

We build the fire side. Your greenhouse builder or mechanical contractor builds the water side. Tap a group to see who supplies it.

SCW BUILDS AND SUPPLIESYOUR BUILDER OR CONTRACTORBoiler-to-tankset per jobFuel buildingwalking floorControlsphone + text alarmsSCW boilerchain grate stokerand certified vesselMulti-cyclonefan and stackStorage tanksized by your builderGreenhouse heatpipe rail, under-benchpump and mixing valveYour backupgas or propaneCO₂
The whole system
Running in greenhouses now

Three greenhouses, about half the heating cost

Vanderveens Greenhouse range in winter with steam from the boiler stacks
Vanderveens Greenhouse · Manitoba
Four boilers, one building, and our heating bill is about half what gas cost us.Vanderveens Greenhouse, Manitoba
4 boilersin one building
Wood chipsfuel
Natural gasreplaced
About 50%lower heating cost
Read the Vanderveens story →
The 18 million BTU SCW boiler for Zyromski Greenhouse loaded on a trailer in the SCW shop

Zyromski Greenhouse, Quebec

18M BTU (CGS 2600) · wood chips · flowers and plants · 2024
The crane day went smooth, and it has run two winters without fuss. Our heating cost is about half what it was.Read the story →
The 5 million BTU SCW boiler at Pépinière Janelle, Quebec

Pépinière Janelle, Saint-Germain-de-Grantham, Quebec

5M BTU · wood chips · replaced propane · 2026
Our heating bill is about half what we paid for propane, and the install went fast. SCW built it, and they still keep an eye on it.Read the story →
Night alarms and backup

Who watches it at 3 a.m.

A cold night with a crop in the house is the real risk. Here's how that's covered.

  • Text alarmsThe system texts you if something needs a look, before it becomes a cold greenhouse.
  • Same screen on your phoneCheck water temperature, feed and fans from the house. With your OK, we can log in from our shop in Headingley.
  • Your old boiler staysMost growers keep their gas or propane boiler as backup.
  • If the power goes outFans and fuel feed stop, the fire burns down in the firebox and the boiler's safeties handle the leftover heat. A backup generator for pumps and controls is a good idea. It starts again when power returns.
  • Parts and serviceParts on our shelf in Headingley, and we come out when it's needed.
Service and support
Fuel planner

How much fuel, month by month

Put in what you burn now. You'll see roughly how many tonnes of chips that is, which months take the most, and how much to keep under cover.

What you burn now
Months you heat
What you'd burn

0tonnes of green chips a year
0semi loads a year, at about 30 tonnes a load
–busiest month
0 tto keep under cover: one week of your busiest month

Rough guide. 1,000 L of propane is about 3 tonnes of green wood chips; 1,000 m³ of natural gas or 1,000 L of oil is about 4 tonnes. Months are split using typical temperatures for your area. Your fuel's moisture changes the real tonnes.

FuelTypical energyGood to know
Green wood chipsAbout 8 to 10 million BTU a tonneWhat most of our greenhouse customers burn. The chain grate handles wet chips without jamming.
Dried wood chipsAbout 12 to 14 million BTU a tonneFewer loads to haul and store. Usually costs more.
Sawmill wasteAbout 9 to 16 million BTU a tonneSawdust, shavings and bark. Varies a lot with moisture.
Wood pelletsAbout 16 to 17 million BTU a tonneClean, dry and easy to store. The most expensive per tonne.
HullsAbout 15 to 16 million BTU a tonneA good fuel if there's a mill close by.

Watch for: steady moisture from your supplier, not too many fines or stones, and screened chips so long sticks don't bridge in the augers. See fuel handling and the portable walking floor.

Is it right for you?

Is biomass right for your greenhouse?

Usually a good fit

  • You heat through the winter, not just a few weeks in spring
  • A big gas, propane or oil bill every year
  • Wood chips or sawmill waste you can get close to home
  • Room for a fuel building and a semi to unload
  • Hot water heat with a storage tank, or plans for one
  • Someone on site most days to take deliveries and check the screen

Maybe not

  • You only heat a few weeks in spring
  • A small house with a small fuel bill
  • No steady fuel supply nearby
  • No room for fuel storage or truck access

Not sure? Send us a year of fuel bills and we'll tell you straight.

From order to heat

How a greenhouse job goes

Send your numbersA year of fuel bills, growing area, covering, crop and tank plans.Week 1
Sizing and quoteWe size the boiler and fuel handling with you and your builder.1 to 2 weeks
Grants firstIf a program fits, most want approval before you order.Before ordering
Built in our shopBoiler, stoker and controls built and wired in Headingley.1 to 3 months
InstallBy our crew, or your contractor with our support.Depends on the job
Start-upWe tune it to your fuel, train your people and watch it remotely.Ongoing

Order by early summer to be running before fall.

Grant checker

Grants and tax credits for greenhouses

About half of our systems are sold with a grant or tax credit. Greenhouses don't always fit the same programs as other farms, so check yours.

ProvincialGreen Energy Equipment Tax Credit15% on biomass heating equipment used in a business.
FederalClean Technology Investment Tax CreditUp to 30%, refundable. Waste biomass heating equipment was added. Who can claim depends on your business, so ask your accountant.
Doesn't cover greenhousesÉcoPerformance, simplified streamPays 75%, up to $100,000 per measure, to switch from oil or propane to bioenergy. Greenhouses are left out of this stream.
ProvincialÉcoPerformance, standard streamUp to 75%. Ask us whether your greenhouse project fits this route.
FederalClean Technology Investment Tax CreditUp to 30%, refundable. Waste biomass heating equipment was added. Who can claim depends on your business.
FederalClean Technology Investment Tax CreditUp to 30%, refundable. Waste biomass heating equipment was added. Who can claim depends on your business.
ProvincialOntario programsPrograms change often. Send us your details and we'll check what's open for your greenhouse.
FederalClean Technology Investment Tax CreditUp to 30%, refundable. Waste biomass heating equipment was added. Who can claim depends on your business.
ProvincialYour provinceAsk us. We'll tell you what we know and who to call.
USDAREAP grantsGrants up to $500,000 for farms and rural small businesses. Right now the system must already be running before you apply.
USDAREAP loan guaranteesOpen now, for financing the system.

Checked November 2026. Rules change, so check before you apply. Most programs want approval before you order equipment.

See all grant programs
Get a straight answer

What to send us

  • A year of gas, propane or oil bills
  • Growing area and covering (glass, poly, curtains)
  • Your crop and the night temperature you hold
  • Your storage tank size, or your builder's plan
  • What fuel you can get close to home
  • A few photos of the greenhouse and the boiler room

We'll tell you what size fits, whether one boiler or several makes sense, and whether biomass pays for your greenhouse. If it doesn't, we'll say so.

Get a quote

Or call (204) 694-2398. Road 63 North, Headingley, Manitoba.

Questions growers ask

Before you call

No. Your greenhouse builder or mechanical contractor sizes and supplies the tank, pumps and mixing valves. We size the boiler to work with your tank. How the boiler ties into the tank depends on the job, and we tell you at quote what's in our scope.
Your builder or engineer decides. The planner above shows roughly how a bigger tank lets you run a smaller boiler. Bring those numbers when you talk to them.
Yes. Most growers keep it as backup.
No. Biomass flue gas isn't clean enough to put in a greenhouse. Growers who enrich with CO₂ keep a separate CO₂ source.
The system modulates. On mild days the feed screw slows down to match what the greenhouse needs, and the controls hold the water temperature. Your tank smooths out the swings.
Both work. Zyromski runs one 18 million BTU boiler. Vanderveens runs four out of one building. We look at your load, your tank and your backup and size it with you. See our hot water boilers.
Wood chips, sawmill waste, pellets and hulls. Our chain grate stoker handles wet and mixed chips without jamming, and the ash leaves on its own. See how it works.
About 1 to 3 months to build, depending on size. Order by early summer to be running before fall.
Certified

The marks your engineer will ask for.

CSABoiler vessel
ASMEBoiler vessel
IntertekChain grate stoker

Need another mark for your project? We build to it.

Someone near you

Talk to a person who knows the system.

Service, parts and remote monitoring come straight from the people who built it.